The ATO over ETCS specification is in force. The rules for running trains with it are still largely national.
FRMCS has been shown to work. This free report sets out what railways now need to decide about it, and when.
Sweden separated track and train but kept a strong national centre. Simon Fletcher on what GBR should learn.
Telemetry is routine on track machines. Plasser & Theurer’s Christopher Rothschedl on making that data useful.
Banedanmark is replacing masts, foundations and overhead wires between Jægersborg and Holte, the second stage of a programme renewing around 33km of S-Bahn traction power.
Kapsch TrafficCom has gone live with its ÖTS3 traffic signal management system in Stockholm for Trafikverket, with Gothenburg next and full deployment covering 360-plus signals.
The €17 million agreement extends a partnership dating back to 1994, covering preventive and corrective maintenance, safety inspections and a backup locomotive for Ferrovalle.
An eight-company consortium led by SYSTRA will carry out surveys, feasibility studies and FEED for Vietnam’s planned 1,541km North–South high-speed line.
Banedanmark is replacing masts, foundations and overhead wires between Jægersborg and Holte, the second stage of a programme renewing around 33km of S-Bahn traction power.
UITP’s president on why resilience means paying for assets, people and exercises long before a failure arrives.
Simon Fletcher, founder of Fletch Rail Advisory, examines the strategic choices behind rail traction energy, weighing electrification, battery and hydrogen solutions and the challenges of scaling them across networks.