Telemetry is routine on track machines. Plasser & Theurer’s Christopher Rothschedl on making that data useful.
DXC’s Hari Prasad Govindarajan on why the railway needs the right AI on the right problem, not more of it.
Railways must maintain GSM-R while preparing staff for FRMCS. GRR examines the skills gap and where the expertise could come from.
On the platform: GBRX’s Doctor Sarah Schlobohm on the pathfinder model built to take rail’s AI from pilot to everyday use.
Hitachi Rail has opened a $30m Toronto headquarters for more than 1,100 staff, housing engineering simulators and global development of its SelTrac CBTC signalling.
The Federal Ministry of Transport and DB InfraGO have revised the corridor renovation programme, prioritising 13 corridors to 2031 and making ETCS the standard.
MTR Corporation has appointed Arup to develop preliminary designs for the 7.5km medium-capacity line, which will use the Smart and Green Mass Transit System.
Alstom’s CBTC signalling is now in revenue service on the 7.5km elevated Priority Section of Bengaluru Metro’s Pink Line, operating at GoA2 from day one.
Hitachi Rail has opened a $30m Toronto headquarters for more than 1,100 staff, housing engineering simulators and global development of its SelTrac CBTC signalling.
UITP’s president on why resilience means paying for assets, people and exercises long before a failure arrives.
Simon Fletcher, founder of Fletch Rail Advisory, examines the strategic choices behind rail traction energy, weighing electrification, battery and hydrogen solutions and the challenges of scaling them across networks.