The Brenner Base Tunnel – A railway line for the future
The construction of the 64km-long Brenner Base Tunnel (BBT) is…
5 August 2014 | By Konrad Bergmeister, CEO at BBT SE
The construction of the 64km-long Brenner Base Tunnel (BBT) is in full swing. After the completion of three construction lots in Italy and Austria with an investment of €550 million, the next construction lots are on the way. Konrad Bergmeister, CEO at BBT SE – the company tasked with construction…