The challenge to connect Denmark and Germany with the right signalling systems
With a length of 18.2km, the Fehmarn Belt Fixed Link…
With a length of 18.2km, the Fehmarn Belt Fixed Link between Fehmarn in Germany and Lolland in Denmark will be the world’s longest combined rail and road tunnel and an important piece of EU infrastructure. A tunnel of this length and with handover of trains between Denmark and Germany to…