Bulgaria works hard to reduce level crossing fatalities
The total track length of the railway network of the…
The total track length of the railway network of the Republic of Bulgaria is 6,529km and there are 790 level crossings managed by the National Railway Infrastructure Company (NRIC) of which 140 have manual barriers, 127 have electrical barriers, 108 operate with automatic block, 274 operate with automatic devices, and…